|
Installation
Typical install times are 3-5 weeks
 1 |
 2 |
 3 |
 4 |
 5 |
 6 |
 7 |
 8 |
| |
|
|
|
| 1. The pool layout is carefully marked for precision. |
| 2. The dig begins the process for perfection. |
| 3. The hole is carefully prepared to achieve proper shape and depth. |
| 4. Now that the parameters are correct, the pool is ready to be set in place. |
| 5. The timely process of filling the pool with water begins. |
| 6. The proper plumbing and electrical equipment is installed. |
| 7. The concrete is poured around the pool and its foundation. |
| 8. Your lifetime guaranteed Viking Pool. |
|